Published on November 24, 2026. Written by Louise Baudry, Product Growth Marketer at Sustaain
The EU Deforestation Regulation (EUDR) applies from December 30, 2026, for large and medium-sized operators, and from June 30, 2027, for micro and small ones. Its obligations are spread across a long list of articles, and not all of them weigh the same. Some set rules that are simple to follow once a process is in place. Three of them, the core of EUDR due diligence (information collection, risk assessment, and mitigation), take most of a compliance team’s time, for every lot.
This article shows how Sustaain covers the articles that shape day-to-day compliance. It also explains the choices behind our approach: what is quick to handle, where the real work is, and how to keep that work proportionate.
Key Takeaways
Most EUDR obligations are rules and records: simple to follow once a process is in place.
Due diligence (Articles 8 to 11) is where most of the work sits: collecting plot-level data, assessing risk, and mitigating it.
Starting data collection when suppliers are onboarded, before a lot exists, front-loads most of that work.
The rules that frame the process
Three articles set the frame. They are short, but everything else in the regulation exists to satisfy them.
Article 3: three conditions to sell or export
Article 3 sets three conditions before a product can be placed on the EU market, made available on it, or exported. It must be:
deforestation-free (no deforestation after December 31, 2020);
produced in line with the relevant laws of the country of production;
covered by a due diligence statement.
Micro and small primary operators in low-risk countries can submit a one-time simplified declaration instead. In practice, this calls for a clear gate: no lot should reach a statement while a check is still open.
That gate is built into the platform. On Sustaain, a lot’s statement is only generated once every assessment linked to it has passed.
Article 4: the due diligence statement
Each statement must be submitted through TRACES NT, the EU Information System, before products are placed on the market or exported. It must be kept for five years, and its reference number passed to the next companies in the chain. Across many lots, entering the same data by hand quickly becomes a bottleneck.
Sustaain syncs with TRACES NT, so statements are built from the data already collected on the platform. They can be submitted directly, with Sustaain acting as authorized representative (a role provided for in Article 6), or generated as files for manual submission.
Article 5: what your clients must keep
Since the December 2025 amendment, downstream operators and traders do not file their own statements. They collect and keep, for five years, the details of their suppliers and customers, along with the statement reference numbers they receive. Large companies, meaning those that are not micro, small, or medium-sized enterprises (SMEs) under EU accounting rules, must also register in the EU Information System. Your clients therefore need your reference numbers, in a form they can file.
We generate a shareable report with each statement reference number, ready to send to your clients.
Where the real work is: EUDR due diligence in three steps
Article 8 defines due diligence in three steps: collect information (Article 9), assess risk (Article 10), and mitigate it (Article 11). It applies to every product, before it is placed on the market or exported.
Unlike the rules above, this work repeats for every lot, and much of the data it needs comes from suppliers, not from your own systems. That is where the effort concentrates, and where our approach makes the difference: collect once and early, assess in a way you can explain, and fix only what failed.
Article 9: collect the right data, early
Article 9 is demanding. For every product, operators must collect, and keep for five years:
a description and the quantity of the product;
its country of production;
the geolocation of every plot of land, with the date or time range of production;
the contact details of suppliers and customers;
verifiable evidence that the product is deforestation-free and legal.
Plots larger than four hectares, except for cattle, must be mapped as polygons rather than single points. Gathered lot by lot, once a contract is signed, this data arrives late, and data quality issues show up when there is little time left to fix them.
Our approach is to start earlier. Data collection begins when suppliers are onboarded, before a specific lot exists. Sustaain checks geolocation files (CSV, GeoJSON, KML) as soon as they are imported, so errors surface before they block a statement. Supplier and country data then carry over from one statement to the next, instead of being collected again for each shipment.
Article 10: assess risk you can explain
Article 10 asks operators to conclude whether the risk of non-compliance is negligible. The criteria look at the country of production, from its risk classification to deforestation, corruption, and law enforcement.
They also cover the presence and claims of indigenous peoples, the complexity of the supply chain, and the risk of mixing with products of unknown origin. Operators must show how they reached their conclusion and review it at least once a year. A risk score on its own does not meet that bar: the reasoning behind it has to be visible.
The platform splits risk assessment, from supplier to deforestation risk, into four separate checks:
Supplier: before a supplier can feed a lot covered by a due diligence statement, it must pass a supplier risk assessment across six risk dimensions, with any red flag mitigated first. The assessment is renewed every year.
Deforestation: the platform checks each plot against forest, deforestation, and degradation data and calculates its risk level: Low, High, or More info needed.
Traceability: the proof required for each lot depends on country and supplier risk.
Legality: the platform checks compliance across the eight areas of law the EUDR lists, from land rights to tax.
Each assessment is built on pass/fail criteria rather than weighted scores. Weighted scores make it hard to trace why a lot failed. With pass/fail, a high-risk result points to the exact data point that caused it, which is easier to defend in an audit and easier to fix.
Article 11: mitigate where it matters
Article 11 requires operators to take measures until the risk is negligible, for example by requesting more information or commissioning independent surveys or audits, and to document every decision. Large operators must also appoint a compliance officer and set up an independent audit function. Without knowing exactly what failed, mitigation means reopening the whole file.
Because each failed assessment points to a specific data point, mitigation on Sustaain is targeted. The platform supports supplier engagement and satellite image analysis, and logs every change to supplier answers, so the decision trail is ready for audit.
Keeping the effort proportionate
The European Commission classifies countries, or parts of them, as low, standard, or high risk (Article 29). Under Article 13, if all products come from low-risk origins and the risk of mixing with products from other origins is negligible, operators can skip risk assessment and mitigation.
They still need documentation showing that the risk of mixing is negligible, and any new information pointing to a risk brings full due diligence back. Outside that case, applying the same depth of checks everywhere spends effort where the risk is lowest.
On Sustaain, the depth of each check follows the risk level. Legality checks range from a country-level confirmation where risk is lowest to a full analysis of specific legislation where it is highest. Traceability proof scales the same way, and certifications that include chain of custody audits lower it further. Low-risk origins do not carry the same workload as high-risk ones.
Proving it over time
Operators must keep their due diligence system up to date, review it at least once a year, and keep all due diligence documentation for at least five years (Article 12). Large companies must also report publicly on it every year, and can include this in reporting they already do under other EU value chain due diligence rules.
National authorities can then check the system and the evidence behind specific products, including on site (Article 18), and operators must give them access to their premises, documents, and records (Article 4). The hard part is less keeping documents than finding the right ones, for the right shipment, years later.
Sustaain keeps five years of records and system updates, documents the risk assessment methodology for the yearly review, and supports public reporting. All evidence is stored in one place and linked to its supplier and lot. When an inspector asks about a given shipment, there is no file to rebuild.
From compliance to sourcing decisions
Seen article by article, the EUDR is a list of obligations. Seen as a workflow, it runs on a continuous stream of supplier, plot, and trade data. The same data that proves a lot is compliant also shows which origins and suppliers carry the least risk, and where to source next. That is where compliance turns into sourcing intelligence.
Want to see how this applies to your own supply chain? Book a demo: we come with a working hypothesis on your highest-exposure origin.
Frequently asked questions
What happens if one plot in a lot shows deforestation?
Any deforestation or forest degradation on a plot automatically disqualifies the commodities produced on it (Article 9). The lot can only be covered by a statement if those volumes are excluded and the risk of mixing them back in is negligible.
Is a single GPS point enough for every plot?
Only for plots of four hectares or less, with at least six decimal digits. Larger plots must be mapped as polygons, except for cattle, where geolocation refers to the establishments where the animals were kept. Micro and small primary operators can give the postal address of their plots instead.
Does a certification replace due diligence?
No. Under Article 10, information from certification or other third-party verified schemes can feed the risk assessment as complementary information, provided it meets the information requirements of Article 9. On Sustaain, certifications that include chain of custody audits reduce the traceability proof required.
Who is responsible when an authorized representative submits the statement?
The operator. Article 6 lets operators mandate an authorized representative to submit statements on their behalf, but the operator keeps full responsibility for the compliance of its products.
Read more
-
EUDR and the TRACES Platform: What Breaks Before, During and After the DDS
-
EUDR Supplier Risk Assessment: From Questionnaire to Contract Allocation
-
From field data to business decisions: XLSForm
-
Volcafe entrusts Sustaain for their EUDR compliance portal
-
From EUDR Paperwork to One Data Model
-
Sustaain Partners with Odds for EUDR & CSRD Compliance